Skip to product information
1 of 8

QILIPSU

QILIPSU Outdoor Electrical Box, 11.4"x7.5"x5.5" Waterproof Junction Box IP67 ABS Plastic Enclosure Weatherproof Grey Hinged Cover for Electric Project Control

QILIPSU Outdoor Electrical Box, 11.4"x7.5"x5.5" Waterproof Junction Box IP67 ABS Plastic Enclosure Weatherproof Grey Hinged Cover for Electric Project Control

Regular price $49.28 USD
Regular price $49.28 USD Sale price

About This

  • IP67 Waterproof: This waterproof junction box features an IP67 rating, providing reliable protection against water, dust, and other environmental challenges. Its robust design is perfect for both indoor and outdoor applications, ensuring your valuable electrical equipment stays safe in harsh environments—saving you from the hassle of replacements due to water damage
  • Premium Quality: Crafted from high-grade ABS plastic, our outdoor electrical box offers long-lasting durability, reliable impact resistance, and excellent electrical insulation. No matter if you are a business, a government agency, or a DIY enthusiast, this enclosure box provides the balance of performance and affordability to meet your needs
  • Easy to Customize and Install: Our weatherproof project boxes are easy to drill without cracking, and the included mounting plate makes equipment installation simple, helping you customize any projects effortlessly while saving valuable time
  • Versatile Solutions: Our waterproof electrical box is engineered to be suitable for wide applications, such as lighting systems, routers, POE switches, CCTV cameras, Starlink devices, solar panels, irrigation systems, ham radios, LEDs, power supplies, pool controls, Wi-Fi devices, and more. This versatility broadens your opportunities and gives you more flexibility
  • Dimensions: The External size is 11.4"x7.5"x5.5" (290x190x140mm) for this waterproof box. The Internal size is detailed in our dimension drawing. Please double-check these dimensions before purchasing to ensure a perfect fit
  • QILIPSU Unique Service: At QILIPSU, we take pride in creating genuine value through exceptional products and services, all thoughtfully designed with your satisfaction in mind—a commitment trusted by our esteemed loyal customers. This dedication drives everything we do and is reflected in every product we offer, each one supported by dependable after-sales service to ensure reliable support whenever you need it. If you have any questions, please don't hesitate to contact us for a prompt and helpful response

Overview

  • Material : ABS Plastic
  • Brand : QILIPSU
  • Color : Grey Cover
  • Style : Compact
  • Product Dimensions : 5.5"D x 7.5"W x 5.5"H
View full details